Jump to Content

Time-variable tariffs and grid fees: HT/NT, heating power, § 14a Module 3

From the classic high/low tariff with a two-rate meter, via heating power with blocking periods, to the time-variable grid fee under § 14a EnWG Module 3: prices that depend on the time of day need tariff periods, separate registers and a calendar in the billing system.

Deep diveUpdated: August 2026

Electricity is cheaper at night – that sentence is as old as the night storage heater. What has changed is the mechanics behind it: a ripple-control receiver used to switch on the second register at 10 pm; today the distribution grid operator defines time windows, distributes them via market communication and the intelligent metering system assigns every quarter-hour. The principle is unchanged, the demands on billing are not.

Three generations of time-dependent prices#

HT/NT (two-rate tariff)Heating power / heat pump tariff§ 14a Module 3
What variesthe supplier's unit rate, often the grid fee toothe supplier's unit rate for a separately metered installationonly the distribution grid operator's grid fee
Time windowstwo: Hochtarif (HT, high rate) by day, Niedertarif (NT, low rate) at night (and often at weekends)release periods and Sperrzeiten (blocking periods), usually several blocks a dayat least three: high load, standard, low load – set per grid area
Meteringtwo-rate meter with two registers (1.8.1 / 1.8.2)own meter for the installation, switched by ripple-control receiver or control boxintelligent metering system with quarter-hour values
Who switchesgrid operator (ripple-control signal) or a timer in the metergrid operatornobody – assignment is arithmetic, per quarter-hour
Sincedecadesdecades, re-regulated by § 14a EnWG1 April 2025

HT/NT: high and low rate#

The two-rate tariff divides the day into two Zählzeiten (tariff periods). During the high-rate period (HT) the first register counts, during the low-rate period (NT) the second; each gets its own Arbeitspreis. The boundaries are set by the grid operator – classically NT runs from 10 pm to 6 am, and many grid areas count the weekend wholly or partly as NT time. The supplier adopts the grid operator's tariff periods because it does not control the meter's switching itself.

Two-rate billing

Consumption HT (1.8.1)
2,400 kWh × 36.50 ct/kWh = €876.00
Consumption NT (1.8.2)
3,600 kWh × 28.90 ct/kWh = €1,040.40
Grundpreis €16.90/month
€202.80
Invoice total€2,119.20

Heating power and heat pump tariffs#

Night storage heaters and heat pumps have long had tariffs of their own, because their consumption is large, predictable and interruptible. The price advantage comes above all from the reduced grid fee the grid operator grants in return for controllability. That comes with conditions:

  • Separate metering: the installation hangs on its own meter or its own Marktlokation – household electricity continues through the standard meter on the standard tariff. For heat pumps a cascade metering setup is also common: the heat pump meter sits behind the main meter and its consumption is deducted.
  • Sperrzeiten (blocking periods): the grid operator may interrupt the installation at peak times – classically up to three times two hours a day, laid down in the technical connection conditions. The installation's storage (water, screed, storage bricks) bridges the pause.
  • Release periods: night storage heaters typically charge in a night window of about eight hours, often with a shorter top-up at midday. During release periods the meter counts to the NT register.
  • No mixed consumption: connect a household appliance to the heat pump meter and the tariff is lost – meter control lies with the metering point operator.

§ 14a Module 3: the time-variable grid fee#

Module 3 is the newest stage: since 1 April 2025 distribution grid operators must offer a time-variable grid fee for controllable consumption devices. It is not a stand-alone module but an add-on to Module 1 – the flat reduction stays, and on top the grid fee's unit rate varies by time of day. It cannot be combined with Module 2, because there the unit rate is already reduced.

Three time windows
The distribution grid operator sets at least three time windows with different unit rates for its grid area: high load (HT, markedly dearer than the standard price), standard (ST) and low load (NT, markedly cheaper). The windows may differ by weekday and season and are published by the grid operator.
Only for the controllable device
The time-variable grid fee applies to the Marktlokation the controllable device hangs on – with shared metering alongside the household, therefore, to that Marktlokation's entire consumption; with separate metering only to the device's consumption.
Prerequisite
An intelligent metering system delivering quarter-hour values. Without an iMSys nobody can establish in which window the consumption occurred.
Effect
The grid-fee share of the unit rate shifts: whoever runs heat pump or wallbox in the low-load windows pays less grid fee than under Module 1 alone; whoever charges in the evening of all times pays more. The supplier has to reflect this in its tariff – as a time-variable tariff of its own or by passing the grid fee through.

Zählzeitdefinitionen in market communication#

So that supplier and metering point operator use the same time windows as the grid operator, Zählzeitdefinitionen (tariff period definitions) are exchanged via market communication. The grid operator publishes, per grid area, which registers count at which times on which days; the metering point operator configures the metering system accordingly, the supplier adopts the windows into its tariff logic. The message format UTILTS exists for this, carrying tariff period definitions and calculation formulas; the assignment of a Marktlokation to a tariff period definition runs through the master data in UTILMD.

What the billing system needs#

  1. 1

    A register per time zone

    Consumption is not kept as one number but per tariff period – with HT/NT two registers on the meter, with Module 3 three registers formed arithmetically from quarter-hour values. Each register has its own OBIS code, its own reading and its own price.

  2. 2

    A calendar with validity

    Which quarter-hour falls into which window is decided by a calendar per grid area and tariff period definition: weekdays, clock times, season. The calendar has a validity period and is versioned – billing a period uses the version valid at the time.

  3. 3

    Public holidays

    Many tariff period definitions treat national and state-specific public holidays like a Sunday. The grid area determines the federal state – a grid operator with networks in two states can have two holiday calendars. Corpus Christi is a holiday in Bavaria, not in Hamburg.

  4. 4

    Assigning the metered values

    For iMSys customers the metering point operator delivers via MSCONS either the quarter-hour values or values already aggregated per register. In the second case the assignment used by MSB and supplier must be identical – otherwise the grid invoice will not match the customer invoice.

  5. 5

    Daylight saving

    The day with 23 hours and the day with 25 are the most reliable sources of error: quarter-hour series run in UTC, tariff windows in local time. The mapping must be tested on both changeover days.

  6. 6

    Two calendars when combined

    With a dynamic tariff plus Module 3, the exchange price (hourly or quarter-hourly, nationwide) and the grid fee (three windows, per grid area) run on separate time axes. The price per quarter-hour is the sum of the components valid at that moment.

Related topics

Law, taxes & levies§ 14a EnWG – controllable devicesHeat pumps, wallboxes, air conditioners and batteries above 4.2 kW may be curtailed briefly by the grid operator – in exchange for reduced grid fees.Market & fundamentalsGrid feesFees for transporting and distributing energy including the state charges levied with them – about a quarter of the electricity price.Tariffs & pricingDynamic electricity tariffsThe unit rate follows the hourly or quarter-hourly exchange price. Since January 2025 every supplier must offer one – provided the customer has a smart metering system.Meters & meteringMeter registerA counter inside the meter: each register accumulates one specific quantity – consumption, feed-in, peak or off-peak.Meters & meteringMeter typesFrom the spinning-disc meter to the smart metering system: what each type can do and how to recognise it.Systems & equipmentHeat pumpTurns one kilowatt-hour of electricity into three or four of heat by lifting ambient warmth to a usable temperature.Systems & equipmentWallbox and chargingThe home charging point – usually 11 kW, which means registration with the grid operator and controllability under § 14a EnWG.Meters & meteringMetering time definitions and configuration IDThe market communication object that defines which quarter hour falls into which meter register – the basis for time-variable grid fees and time-variable tariffs on a smart metering system.Meters & meteringSmart metering systemA digital meter plus a smart meter gateway: measures every quarter hour, transmits encrypted, and is the precondition for dynamic tariffs and § 14a EnWG.

Sources & further reading