Switching processes under GPKE and GeLi Gas
The business processes for customer supply laid down by the Bundesnetzagentur: registration, deregistration, termination, master data, meter readings and grid-usage billing between supplier, grid operator and metering point operator.
The article Switching supplier describes what the customer experiences. This one is about the machinery behind it: GPKE (“Geschäftsprozesse zur Kundenbelieferung mit Elektrizität”) for electricity and GeLi Gas (“Geschäftsprozesse Lieferantenwechsel Gas”) are rulings (Festlegungen) of the Bundesnetzagentur, the federal regulator. They prescribe for every market partner which message to send to whom and when – and what happens if they do not.
Who is involved#
- New supplier (LFN)
- Triggers the process: registers the Marktlokation with the grid operator and terminates with the previous supplier.
- Old supplier (LFA)
- Confirms or rejects the termination, deregisters the Marktlokation and issues the final invoice.
- Grid operator (NB)
- Keeps the assignment of the Marktlokation to supplier and balancing group, checks registrations, responds, maintains master data and bills grid usage.
- Metering point operator (MSB)
- Delivers the meter readings for the switch date – normally via the grid operator, directly where a competitive MSB is involved.
- Balancing coordinator (BIKO)
- The transmission system operator in its role for balancing group settlement – receives the aggregated assignments, not the individual cases.
The roles are defined functionally, not organisationally: a municipal utility can be LFA, NB and MSB at the same time – and still has to route the messages internally as if it were three companies (unbundling). Partners are addressed by their market partner ID.
The messages#
Technically everything runs over market communication. Master data exchange uses the UTILMD format; which business case is meant is stated in the Transaktionsgrund (transaction reason – e.g. supplier switch, move-in or move-out, assignment to substitute or basic supply). The reply is a separate UTILMD message carrying an Antwortcode (response code): acceptance, or rejection with a reason.
| Process step | From → To | Message | Deadline (order of magnitude) |
|---|---|---|---|
| Termination with old supplier | LFN → LFA | UTILMD (termination) | Reply within a few working days; the old contract's notice period remains decisive |
| Grid usage registration | LFN → NB | UTILMD (registration, Transaktionsgrund) | Since LFW24 at the earliest for the next day, reply within one day |
| Confirmation / rejection | NB → LFN | UTILMD (reply with Antwortcode) | Deadline-bound; silence is not consent |
| Deregistration by old supplier | LFA → NB / NB → LFA | UTILMD (deregistration or notice of supply end) | As of the confirmed switch date |
| Zuordnungsliste (assignment list) | NB → LF | UTILMD (list of all assigned Marktlokationen) | Monthly; the supplier must report discrepancies back |
| Master data change | responsible role → affected roles | UTILMD (change) | Without delay after the change, e.g. meter replacement or address correction |
| Meter reading on the key date | MSB/NB → LFA and LFN | MSCONS | A few working days after the key date; otherwise a substitute value |
| Grid usage billing | NB → LF | INVOIC, remittance advice back via REMADV | Monthly (instalments) and after meter reading – see grid usage billing |
Move-in and move-out in the process#
- Move-in with a contract: the supplier registers with the Transaktionsgrund “move-in” – retroactively within narrow limits, because the customer has already consumed.
- Move-in without a contract: the grid operator assigns the Marktlokation to the basic supplier (substitute or basic supply assignment); the basic supplier learns about its new customer from this message.
- Move-out: the supplier deregisters; if no successor is known the assignment ends – and the next consumption starts Ersatzversorgung again.
- No switch: if only the contract changes with the same supplier (tariff change), no market communication is needed – the assignment stays.
Typical rejection reasons#
| Category | What is behind it | What the supplier does |
|---|---|---|
| Marktlokation not identifiable | MaLo ID wrong, meter number unknown, address ambiguous | Follow up with the customer, use MaLo-Ident, re-register |
| Period already assigned | Another supplier has already had the same period confirmed | Clarify with the customer; the earlier registration stands |
| Deadline violated | Requested supply start is too early or too far in the future | Choose a new date, re-register |
| Contract binding with old supplier | The old supplier rejects the termination because the notice period is not met | Move the switch to the next possible contract end |
| Formal errors | Mandatory fields missing, code number invalid, wrong data format version | Technical clarification case – usually a mapping problem in the billing system |