Substitute values

The regulated procedure for replacing a missing or implausible metered value with a justified calculated value – flagged, traceable and correctable.

Deep diveUpdated: August 2026

No metering system delivers without gaps. Meters fail, reading cards are not returned, a radio module has no reception for three days. So that billing and balancing keep running anyway, there is a regulated procedure for deriving the value that is missing from what is known. The Ersatzwert (substitute value) is not a stopgap but a defined data object with its own status.

When a substitute value is needed#

  • Missing meter reading – no reading on the key date, neither by the metering point operator nor by the customer
  • Meter failure – the meter or its communication delivers nothing for a period
  • Implausible value – a reading exists but fails the check (see below)
  • Gaps in the load curve – single or many quarter hours of an RLM or iMSys measurement are missing
  • Key date without a reading – a price change, supplier switch or move between two real readings

Who forms it#

Metering point operator
Responsible for the metered values themselves: it checks plausibility, forms the substitute value and transmits it, flagged, to the grid operator and supplier. This is part of metered-value processing under the MsbG.
Grid operator
Responsible for balancing: if a load curve is missing for the balancing group settlement, it forms a substitute load curve under the MaBiS rules so that the balancing group stays complete.
Supplier
Does not form substitute values in the metrological sense. It may, however, estimate for billing where no value is available – under § 11 StromGVV on the basis of the last reading or the consumption of comparable customers – and has to flag that on the invoice.

Plausibility checking: the step before#

Before a value counts as true it is checked. If it fails, it is replaced – even if it was physically read.

CheckQuestionTypical cause on failure
LimitIs consumption within an expected band compared with the previous year or the forecast?Reading error, transposed digits, changed usage
Negative consumptionIs the new reading lower than the old one?Meter exchange without removal/installation readings, meter rollover, HT and NT swapped, decimals included
Zero consumptionHas the reading not moved for months?Vacancy – or a stopped meter
JumpDoes the consumption of a sub-period fit the rest?Wrong reading date, a value from another metering location
Load curveAre quarter hours missing, are there outliers or sign errors?Communication loss, wrong transformer ratio on file

Methods for meter readings#

MethodHowWhen suitable
Vorjahreswert (previous-year value)Consumption of the same period in the previous year, temperature-adjusted for gas via degree daysEstablished site, unchanged use
Load profile extrapolationAnnual consumption forecast spread across the period with the standard load profileThe standard case for SLP customers, especially for key-date splits
InterpolationConsumption between two real readings spread linearly – day-weighted or profile-weighted – onto the key dateKey date lies between two readings (see example)
Vergleichswert (comparable value)Consumption of comparable customers or periodsNew customer without history
Customer estimateThe customer reports an estimated readingOnly as a last resort; also has to be plausibility-checked

Interpolation onto a key date (day-weighted)

Reading 1 on 1 March 2026
12,480 kWh
Reading 2 on 15 May 2026
13,230 kWh
Consumption between the readings
750 kWh in 75 days
Daily average
10 kWh/day
Key date: price change on 1 April
31 days after reading 1
Consumption up to the key date
31 × 10 = 310 kWh
Substitute reading on 1 April12,790 kWh

Methods for load curves#

A load curve has 96 values a day. If some are missing that is a different problem from a missing annual reading – the gap has to be closed at the same resolution.

  • Interpolation of short gaps – a few missing quarter hours are filled linearly between the last and the next valid value
  • Previous-day or previous-week method – longer gaps are filled with the load curve of the same time window on the previous day or, better, the same weekday of the previous week, scaled if necessary
  • Comparable load curve – where no reference day of the site exists, a load curve of a comparable metering location or a profile
  • Reconciliation with the meter reading – if readings exist before and after the gap, the substitute curve is scaled so that the total energy matches

Status in market communication#

In the MSCONS message every value carries a status flag. The receiving system has to evaluate it, not just the number.

Wahrer Wert (true value)
Metered and plausibility-checked. A billing basis without reservation.
Ersatzwert (substitute value)
Formed by one of the methods above. Billable, but to be flagged as estimated on the invoice and corrected when the true value arrives.
Vorläufiger Wert (provisional value)
Transmitted before plausibility checking is complete. Usable for forecasts and interim information, not for the final bill.
Prognosewert (forecast value)
Not a metered value but an expectation – transmitted as such in certain processes, for instance as the basis for instalments or balancing forecasts.

When the true value does arrive#

  1. 1

    Receipt and assignment

    The late value arrives via MSCONS and is assigned to the same metering location and the same period.

  2. 2

    Supersede the substitute

    The substitute value is kept in the history but loses its validity for billing.

  3. 3

    Identify affected invoices

    All invoices resting on the substitute value – including subsequent periods for which it was the opening reading.

  4. 4

    Correct

    Cancellation and recalculation under the rules of invoice correction; the difference as an additional payment or credit, see additional payment and credit.

Related topics

Sources & further reading