The regulated procedure for replacing a missing or implausible metered value with a justified calculated value – flagged, traceable and correctable.
No metering system delivers without gaps. Meters fail, reading cards are not returned, a radio module has no reception for three days. So that billing and balancing keep running anyway, there is a regulated procedure for deriving the value that is missing from what is known. The Ersatzwert (substitute value) is not a stopgap but a defined data object with its own status.
When a substitute value is needed#
- Missing meter reading – no reading on the key date, neither by the metering point operator nor by the customer
- Meter failure – the meter or its communication delivers nothing for a period
- Implausible value – a reading exists but fails the check (see below)
- Gaps in the load curve – single or many quarter hours of an RLM or iMSys measurement are missing
- Key date without a reading – a price change, supplier switch or move between two real readings
Who forms it#
- Metering point operator
- Responsible for the metered values themselves: it checks plausibility, forms the substitute value and transmits it, flagged, to the grid operator and supplier. This is part of metered-value processing under the MsbG.
- Grid operator
- Responsible for balancing: if a load curve is missing for the balancing group settlement, it forms a substitute load curve under the MaBiS rules so that the balancing group stays complete.
- Supplier
- Does not form substitute values in the metrological sense. It may, however, estimate for billing where no value is available – under § 11 StromGVV on the basis of the last reading or the consumption of comparable customers – and has to flag that on the invoice.
Plausibility checking: the step before#
Before a value counts as true it is checked. If it fails, it is replaced – even if it was physically read.
| Check | Question | Typical cause on failure |
|---|---|---|
| Limit | Is consumption within an expected band compared with the previous year or the forecast? | Reading error, transposed digits, changed usage |
| Negative consumption | Is the new reading lower than the old one? | Meter exchange without removal/installation readings, meter rollover, HT and NT swapped, decimals included |
| Zero consumption | Has the reading not moved for months? | Vacancy – or a stopped meter |
| Jump | Does the consumption of a sub-period fit the rest? | Wrong reading date, a value from another metering location |
| Load curve | Are quarter hours missing, are there outliers or sign errors? | Communication loss, wrong transformer ratio on file |
Methods for meter readings#
| Method | How | When suitable |
|---|---|---|
| Vorjahreswert (previous-year value) | Consumption of the same period in the previous year, temperature-adjusted for gas via degree days | Established site, unchanged use |
| Load profile extrapolation | Annual consumption forecast spread across the period with the standard load profile | The standard case for SLP customers, especially for key-date splits |
| Interpolation | Consumption between two real readings spread linearly – day-weighted or profile-weighted – onto the key date | Key date lies between two readings (see example) |
| Vergleichswert (comparable value) | Consumption of comparable customers or periods | New customer without history |
| Customer estimate | The customer reports an estimated reading | Only as a last resort; also has to be plausibility-checked |
Interpolation onto a key date (day-weighted)
- Reading 1 on 1 March 2026
- 12,480 kWh
- Reading 2 on 15 May 2026
- 13,230 kWh
- Consumption between the readings
- 750 kWh in 75 days
- Daily average
- 10 kWh/day
- Key date: price change on 1 April
- 31 days after reading 1
- Consumption up to the key date
- 31 × 10 = 310 kWh
Methods for load curves#
A load curve has 96 values a day. If some are missing that is a different problem from a missing annual reading – the gap has to be closed at the same resolution.
- Interpolation of short gaps – a few missing quarter hours are filled linearly between the last and the next valid value
- Previous-day or previous-week method – longer gaps are filled with the load curve of the same time window on the previous day or, better, the same weekday of the previous week, scaled if necessary
- Comparable load curve – where no reference day of the site exists, a load curve of a comparable metering location or a profile
- Reconciliation with the meter reading – if readings exist before and after the gap, the substitute curve is scaled so that the total energy matches
Status in market communication#
In the MSCONS message every value carries a status flag. The receiving system has to evaluate it, not just the number.
- Wahrer Wert (true value)
- Metered and plausibility-checked. A billing basis without reservation.
- Ersatzwert (substitute value)
- Formed by one of the methods above. Billable, but to be flagged as estimated on the invoice and corrected when the true value arrives.
- Vorläufiger Wert (provisional value)
- Transmitted before plausibility checking is complete. Usable for forecasts and interim information, not for the final bill.
- Prognosewert (forecast value)
- Not a metered value but an expectation – transmitted as such in certain processes, for instance as the basis for instalments or balancing forecasts.
When the true value does arrive#
- 1
Receipt and assignment
The late value arrives via
MSCONSand is assigned to the same metering location and the same period. - 2
Supersede the substitute
The substitute value is kept in the history but loses its validity for billing.
- 3
Identify affected invoices
All invoices resting on the substitute value – including subsequent periods for which it was the opening reading.
- 4
Correct
Cancellation and recalculation under the rules of invoice correction; the difference as an additional payment or credit, see additional payment and credit.