Jump to Content

Switching supplier

Switching supplier changes nothing physically – only which balancing group the site belongs to. Since June 2025 it must be possible within 24 hours.

Updated: August 2026

The customer signs with the new supplier, and everything after that runs between market partners. The customer neither has to terminate anything nor register anything – the new supplier handles it as part of the switching process.

How a supplier switch runs

What happens between the signature and the first invoice

  1. 1

    Day 0

    The customer signs the new contract

    The new supplier needs the name, the supply address and the market location ID or meter number.

  2. 2

    Day 0–1

    Registration with the grid operator

    The new supplier registers the supply; the grid operator checks whether the market location belongs to it.

  3. 3

    Day 1

    The old supplier is deregistered

    The previous supplier is informed and either confirms or objects – for instance where a minimum term is still running.

  4. 4

    from 24 hours

    The switch takes effect

    Since June 2025 a supplier switch has to be possible within 24 hours. Nothing changes physically – only the assignment within the balancing group.

  5. 5

    afterwards

    Final invoice

    The old supplier bills up to the switching day; the reading on the key date comes from the metering point operator or from the customer.

The customer notices nothing physically: the same electricity flows through the same grid. What changes is which balancing group the withdrawal point is assigned to – and with it, who procures and bills the energy.

What the new supplier needs#

  • The customer's name and supply address
  • The market location ID (11 digits including a check digit), or the meter number instead – the MaLo ID can be looked up from address or meter number through the BDEW's MaLo-Ident interface
  • The desired start of supply
  • Whether this is a switch, a move-in or an substitute supply case

The process#

  1. 1Registration with the grid operator – the new supplier registers the market location via UTILMD for the desired start date
  2. 2Termination with the previous supplier – the new supplier terminates the old contract as the customer's authorised representative (Bevollmächtigter)
  3. 3Confirmation or rejection – grid operator and previous supplier respond; a rejection becomes a clarification case
  4. 4Assignment in the balancing group – on the key date the market location moves into the new supplier's balancing group
  5. 5Meter reading transfer – the metering point operator delivers the switch reading via MSCONS
  6. 6Final invoice from the previous supplier – within six weeks of the end of supply, § 40c EnWG

Grounds for rejection#

GroundWhat happens then
An existing minimum term with the previous supplierThe switch is deferred to the end of that term
Market location not foundA clarification case – check address and meter number
Outstanding receivables with the previous supplierNot a ground for rejection – a switch may not fail on this
Registration for a period already assignedRejection due to an existing assignment (Ablehnung wegen bestehender Zuordnung): the earlier registration stands and the later one is rejected – the second supplier has to sort it out with the customer

Related topics

Sources & further reading