Core energy market data register

The regulator's register in which every generation unit and storage system must be entered within a month of commissioning.

Updated: August 2026

The MaStR is the central database of every installation in the German energy system – from a 300-watt balcony panel to a nuclear power station. Without an entry there is no feed-in tariff.

What has to be registered#

  • Every electricity generating installation, including plug-in solar devices
  • Every home battery
  • Deadline: within one month of commissioning
  • Changes – extension, decommissioning, change of operator – also within one month
  • The operator itself, as a market actor in its own right – registering the person or company is a separate step before registering the unit

Why this matters for systems#

The MaStR number identifies an installation uniquely, much as the MaLo ID identifies a withdrawal point. It appears in remuneration processes and in data exchange, and therefore belongs in any data model that represents generating installations. The register is also publicly searchable – useful for plausibility checks.

PrefixObject
SEEElectricity generating unit, such as a PV system or a CHP unit
SGEGas generating unit
SSEElectricity storage unit, i.e. a home battery
ABRAnlagenbetreiber – the operator, a person or company rather than the unit
Structure of the MaStR number: a three-letter prefix followed by twelve digits.

For connecting your own systems, the register offers a full data export as a CSV/XML download and a public web interface. That lets installation data captured during onboarding be checked automatically against the official entry instead of being retyped.