Energy supply contract
The contract between supplier and final consumer: mandatory content under § 41 EnWG, withdrawal, term rules under § 309 Nr. 9 BGB, the cancellation button and special termination rights.
Legally, an energy supply contract is a sales contract for a good that flows continuously. What sets it apart is not the contract type but the density of regulation: the EnWG, the BGB and the Grundversorgung ordinances dictate what it must contain, how long it may bind the customer and how it ends again.
How a contract comes about#
A Sondervertrag (special contract, i.e. anything outside basic supply) arises through offer and acceptance – online, by phone or at the door. There is no statutory written-form requirement, but the terms must be available to the customer before conclusion. The contract in Grundversorgung, by contrast, comes about without any declaration at all: by drawing energy from the grid (§ 2 Abs. 2 StromGVV). Ersatzversorgung arises by operation of law.
Mandatory content under § 41 EnWG#
§ 41 Abs. 1 EnWG requires contracts with final consumers to be simple and comprehensible and to contain at least the following:
- Name and address of the supplier, type of service and quality level
- Contract term, conditions for renewal and termination, notice periods
- Prices and payment terms, including rules on Abschlag instalments and advance payments
- Liability, compensation and refund rules where the service is not delivered as agreed
- Information on consumer rights, complaint procedures and out-of-court dispute resolution (Schlichtungsstelle Energie)
- A pointer to the possibility of switching supplier and the customer service contact details
Withdrawal: 14 days#
If the contract is concluded at a distance (web, phone, app) or off-premises (doorstep, trade fair stand), the consumer has a 14-day right of withdrawal (§§ 312g, 355 BGB). The period only starts once the customer has been properly informed of that right – without the notice it extends to as much as twelve months and 14 days.
Contract terms since 2022#
| Rule | Content | Basis |
|---|---|---|
| Initial term | at most 24 months | § 309 Nr. 9 lit. a BGB |
| Tacit renewal | only for an indefinite period; the customer may then terminate at any time with one month's notice | § 309 Nr. 9 lit. b BGB, since 1 March 2022 |
| Notice period at end of term | at most one month before the initial term expires | § 309 Nr. 9 lit. c BGB |
| Cancellation button | Anyone offering contracts online must provide a button labelled “Verträge hier kündigen” (cancel contracts here) and a confirmation page online; the termination must be confirmed immediately in Textform | § 312k BGB, since 1 July 2022 |
| Grundversorgung | terminable at any time with two weeks' notice, in Textform | § 20 StromGVV / GasGVV |
Special termination rights#
- Price change
- Termination effective on the date the change takes effect, irrespective of term and notice period (§ 41 Abs. 5 EnWG; in Grundversorgung § 5 Abs. 3 StromGVV).
- Moving home
- Termination with two weeks' notice to the moving date, unless the supplier can continue supplying at the new address on the same terms (§ 41b Abs. 1 EnWG) – details in Moving home.
- Ersatzversorgung
- Anyone switching out of Ersatzversorgung has no notice period to observe.
- Switch handled by the new supplier
- In a supplier switch the new supplier terminates as the customer's agent – the notice period of the old contract still applies.
The contract as a state machine#
In sales and billing systems the supply contract is an object with a lifecycle. A robust status model separates the legal state from the supply state, because the two can diverge: a contract can be concluded but not yet supplying; it can be terminated and still be supplied for months.
- 1
Offer
Price and terms are fixed, the customer has not yet accepted. Expires after the binding period.
- 2
Concluded
Acceptance received, withdrawal period running. Supply start has been requested but depends on the switching process – see switching processes.
- 3
Supplying
The grid operator has assigned the Marktlokation, supply start is confirmed. Instalments run, invoices are issued.
- 4
Terminated
A termination is effective, the supply end is fixed or being calculated. Supply continues until then.
- 5
Ended
Supply end reached, switch or move-out reading available, final invoice within six weeks (§ 40c EnWG).
Calculating the termination window
- Supply start
- 1 April 2025
- Initial term
- 12 months → ends 31 March 2026
- Notice period
- 1 month → must be received by 28 February 2026
- Nothing received by then
- renewal for an indefinite period
Related topics
Sources & further reading
- § 41 EnWG – Energielieferverträge mit Letztverbrauchern
- § 41b EnWG – Energielieferverträge mit Haushaltskunden, Umzug
- § 309 BGB – Klauselverbote ohne Wertungsmöglichkeit (Nr. 9: Laufzeit)
- § 312k BGB – Kündigung von Verbraucherverträgen im elektronischen Geschäftsverkehr
- § 355 BGB – Widerrufsrecht bei Verbraucherverträgen
- § 20 StromGVV – Kündigung