Gateway administrator

The market role that operates the smart meter gateway: it configures, updates and manages keys – and decides which metered values go to whom under which tariff application case.

Deep diveUpdated: August 2026

A smart meter gateway does nothing on its own. What it measures, how often it sends and to whom is loaded into it from outside – by the gateway administrator. Anyone who wants to understand why a supplier system sometimes receives one annual value and sometimes 35,040 quarter-hour values from an iMSys needs to know this role.

Who fills the role#

Under § 25 MsbG the metering point operator is responsible for administering the gateway. It may outsource the task to a service provider – many smaller grid operators do – but remains legally responsible. The Gateway-Administrator (GWA) is therefore not a market role of its own in the sense of the GPKE market roles, but a technical function the metering point operator has to fulfil.

Commissioning
On installation the gateway is paired with the GWA, receives its certificates and from then on knows exactly one administrator.
Key and certificate management
Every communication is signed and encrypted. The GWA manages the certificates of the gateway and of the connected market participants in the smart metering PKI.
Configuration
Which meters are connected, which tariff application cases run, which recipients get which data at which interval – all of that is configuration profiles the GWA loads.
Firmware and monitoring
Updates, time synchronisation, evaluation of the gateway logs, fault handling.
Data forwarding
The GWA ensures that metered values reach the entitled parties – either directly from the gateway or via the metering point operator in market communication.

Three interfaces, three networks#

InterfaceConnectsExamples
LMN – Local Metrological NetworkGateway ↔ metersElectricity, gas, water and heat meters; wired or by radio (wireless M-Bus)
HAN – Home Area NetworkGateway ↔ buildingDisplay for the connection user, service technician, CLS devices such as the control box
WAN – Wide Area NetworkGateway ↔ outside worldExclusively to the GWA and to the configured external market participants; via mobile network, LTE-450, powerline or DSL

Star-shaped communication#

The gateway distributes metered values in a star: for each entitled recipient it produces a separate, encrypted data set containing only what that recipient needs for its purpose. Entitled parties are the grid operator for grid operation and balancing, the supplier for billing, the metering point operator, the direct marketer for generating installations – and the connection user itself via the HAN interface. Who may receive what is laid down by the MsbG, not by the recipient (see data protection for energy data).

Tariff application cases (TAF)#

A Tarifanwendungsfall (tariff application case) is a processing pattern in the gateway standardised by the BSI: it defines which metered values from which meter are formed, stored and sent at which resolution. The GWA activates one or more TAFs per metering location – ordered by the supplier or grid operator through the metering point operator.

TAFNameWhat the gateway deliversTypical trigger
TAF 1Data-minimising tariffsOne meter reading per billing period, no consumption values in betweenStandard household without a special tariff
TAF 2Time-variable tariffsConsumption per defined time window (tariff stage), summed inside the gatewayHT/NT tariffs, metering time definitions, time-variable grid fees
TAF 6Reading on demandOne current meter reading on requestMove, supplier switch, interim reading
TAF 7Zählerstandsgang (register-reading series)One meter reading every 15 minutesDynamic tariffs, balancing with real values instead of a load profile
TAF 9Actual feed-inCurrent feed-in power of a generating installationDirect marketing, feed-in management
TAF 10Grid status dataVoltage, current, frequency, phase angle at the grid connectionGrid operation by the distribution grid operator
TAF 14High-frequency metered valuesValues at second-to-minute intervals for value-added servicesEnergy management, visualisation – only with the connection user's consent
A selection. The guideline knows further cases, such as TAF 3 to 5 (load-, consumption- and event-variable tariffs), TAF 8 (extreme values) and TAF 13 (visualisation for the final consumer).

CLS channel and control box#

Measuring and controlling are separated in the iMSys. The gateway measures; controlling is done by a device in the HAN, the Steuerbox (control box), addressed via the CLS channel (Controllable Local Systems). The CLS channel is a transparent, encrypted tunnel opened by the gateway: the entitled external market participant – for § 14a EnWG the grid operator, for feed-in management likewise the grid operator or the direct marketer – talks through the gateway to the control box, without the gateway understanding or altering the content.

  1. 1

    Configure the entitlement

    The GWA registers the controlling market participant as an active external market participant for this CLS channel.

  2. 2

    Open the channel

    The gateway opens the tunnel – again from inside to outside, never the other way round.

  3. 3

    Send the control command

    The grid operator transmits, say, “limit offtake to 4.2 kW” to the control box.

  4. 4

    Execute and log

    The control box switches or dims the heat pump, wallbox or battery. The gateway logs the event; the customer can trace it via the HAN interface.