The location model of market communication

Market location, metering location, grid location, technical and controllable resource: five objects that together describe where energy is traded, metered, handed over to the grid, generated and controlled.

Updated: August 2026

To the customer, a house with photovoltaics, a battery and a heat pump is one connection with one bill. To market communication it is half a dozen objects with their own IDs, their own responsible parties and their own life cycles. The location model defines which objects those are – and who is allowed to manage which of them.

The reason for the decomposition is always the same: each question should be answered by exactly one object. “Who supplies here?” is a different question from “Which device measures?”, and both differ from “What may the grid operator curtail here?”. As long as everything hung off a single metering point, a meter exchange could not be separated from a supplier switch, and a PV system behind the house meter could not be balanced cleanly.

The five objects#

ObjectShortIDAnswersAssigned by
Marktlokation (market location)MaLo11 digits, numeric with check digitWhere is energy supplied or generated? Tied to contract, balancing group, billinggrid operator
Messlokation (metering location)MeLo33 characters, starting with DEWhere is it measured? Tied to the meter panel, not the devicegrid operator; managed by the metering point operator
Netzlokation (grid location)NeLo11 characters, alphanumericWhere is the energy physically handed over to the grid – the point where grid-fee-relevant quantities such as capacity arisegrid operator
Technische Ressource (technical resource)TR11 characters, alphanumericWhich physical device sits behind it – PV system, battery, heat pump, charging pointgrid operator
Steuerbare Ressource (controllable resource)SR11 characters, alphanumericWhat may the grid operator control under § 14a EnWG – and via which channelgrid operator
MaLo and MeLo have existed since 2018. Netzlokation, Technische Ressource and Steuerbare Ressource arrived with MaKo 2022 and were phased into the processes with the following format releases.

How the objects relate#

MaLo ↔ MeLo: n:m
One Marktlokation can be measured by several Messlokationen (cascade, summation meter), and one Messlokation can serve several Marktlokationen (bidirectional meter with a consumption MaLo and a feed-in MaLo). The relationship is described by calculation rules: which meters are added, which subtracted.
MaLo ↔ TR: 1:n
A generating Marktlokation can have several Technische Ressourcen attached – say PV modules and a battery that share the same feed-in point.
TR ↔ SR: 1:n
A device may or may not be controllable. If it is, the Steuerbare Ressource describes the how: control channel, control mode, § 14a agreement.
NeLo ↔ MaLo: 1:n
Several Marktlokationen can sit behind one grid connection point – the heat pump with reduced grid fee and the household on the same house connection.

All objects that belong together at one grid connection form a Lokationsbündel (location bundle). The bundle has no ID of its own; it is the grouping the grid operator holds together in the master data – and in which it describes the calculation steps between metering and market locations.

One house, many objects#

Detached house with PV, battery and heat pump (cascade metering)

Netzlokation
1 NeLo – the house connection
Marktlokationen
3 MaLo – household consumption, heat pump consumption, PV feed-in
Messlokationen
2 MeLo – bidirectional meter at the house connection, sub-meter for the heat pump
Technische Ressourcen
3 TR – PV system, battery storage, heat pump
Steuerbare Ressourcen
1 SR – the heat pump under § 14a EnWG (the battery, if grid-friendly controlled, would be a second)
Objects in the Lokationsbündel10 – for a single customer

Heat pump consumption is measured as a difference: main meter minus sub-meter gives household consumption, the sub-meter alone gives the heat pump. Exactly this calculation rule is part of the master data – without it no supplier can attribute the bidirectional meter's values to its Marktlokation.

Why the model exists#

  • Meter exchange without contract change: a new meter changes the meter number, not the MeLo – and certainly not the MaLo. Contract and balancing group are untouched.
  • Cascades and sub-meters: without separate metering and market locations, a heat pump behind the house meter cannot be billed with its own grid fee.
  • Control: § 14a EnWG requires the grid operator to know what it may control without dimming the whole connection – that is what TR and SR provide.
  • Feed-in and consumption on one device: two Marktlokationen on one bidirectional meter can have different suppliers and balancing groups.

Where it shows up in MaKo#

The objects are exchanged as master data via UTILMD. The grid operator is responsible for MaLo, NeLo, TR and SR, the metering point operator for the data of the Messlokation. In the registration confirmation a supplier sees the Marktlokation with its assigned Messlokationen and calculation rule; meter values arrive via MSCONS per Messlokation and only then become quantities per Marktlokation. Master data changes – new meter, new calculation rule, new Steuerbare Ressource – run as separate UTILMD processes, triggered by whoever is responsible.