Jump to Content

Final, interim and periodic bills

The final bill settles up to the end of supply, the interim bill up to a cut-off date within a running contract, the periodic bill up to the regular end of the billing period – all three share the same arithmetic but differ in trigger, deadline and source of the meter reading.

Updated: August 2026

Every invoice settles a period – the only question is what ends the period. For the periodic bill it is the calendar, for the interim bill an event in the middle of the contract, for the Schlussrechnung (final bill) the end of the supply contract itself. Deadline, source of the meter reading and the treatment of instalments all follow from that one distinction.

Three bill types, one calculation#

Turnusabrechnung (periodic bill)Zwischenabrechnung (interim bill)Schlussrechnung (final bill)
Triggerend of the billing period, usually annualevent during the running contract: price change, customer request, meter exchange, change of billing modeend of the supply contract: supplier switch, move-out, termination, death of the customer, decommissioning
Contract afterwardscontinuescontinuesended – the contract account is settled and closed
Deadlineno later than six weeks after the end of the billing periodno statutory deadline of its own; at the customer's request under § 40b EnWG in the agreed rhythmno later than six weeks after the end of the supply relationship
Instalmentsset off, a new instalment plan startsset off, the instalment plan continues adjustedset off, the instalment plan ends; a credit is paid out
Meter readingperiodic reading by the MSB or customer self-readingfrequently apportioned arithmeticallyswitch or move-out reading, transmitted by the grid operator via MSCONS

The meter reading at the cut-off date#

Whether a bill is sound is decided by the reading at the cut-off date. It has three possible sources, and the bill must state which one it was (§ 40 (2) EnWG):

Read
Collected by the metering point operator or grid operator – automatically and to the day with an intelligent metering system, otherwise on site during a periodic or switch reading. The most reliable value.
Reported by the customer
Self-reading by card, portal or app. Counts as a read value but is sanity-checked: if it is below the previous reading or far above the forecast, it goes back into clarification.
Estimated / apportioned arithmetically
Where no reading exists at all, the value is derived from the last known reading and the consumption pattern – by load profile for electricity, by degree days for gas. Technically this is substitute value formation; the bill says “estimated”.

Apportioning around a price change#

When the price changes in the middle of a billing period, an interim bill is rarely written. Instead the periodic or final bill splits into sub-periods, each with its own Arbeitspreis (unit rate), and without a reading at the cut-off date the consumption is distributed across them:

  • Pro rata by time (linear): days in the sub-period ÷ days in the whole period. Simple, but badly wrong for heating gas – there, two thirds of consumption falls in five winter months.
  • By load profile or degree days: consumption is weighted by the standard load profile (electricity) or the grid operator's degree-day figures (gas). This is the standard and the reason for the invoice note “consumption allocated due to a mid-year price change”.
  • By metered values: with intelligent metering systems or registering load metering, true daily values exist – nothing is distributed, the split is metered.

Final bill after a move-out with a price change in the period

Period
1 October to 15 May (227 days)
Consumption (move-out reading − opening reading)
2,840 kWh
Share up to 31 December by load profile
1,220 kWh × 34.50 ct/kWh = €420.90
Share from 1 January by load profile
1,620 kWh × 36.80 ct/kWh = €596.16
Grundpreis €12.90/month, pro rata by day
€96.27
Invoice total
€1,113.33
7 instalments of €140.00
− €980.00
Back-payment, due with the final bill€133.33

Setting off the instalments#

All Abschläge (instalments) that fell due in the period are deducted from the invoice total – whether they were actually paid is a question for the contract account, not the bill. An unpaid instalment remains as a receivable in its own right; the bill itself shows only the balance of consumption costs and instalments demanded. A credit on a final bill must be paid out without delay – there is no more offsetting against the next instalment, because no instalment follows.

The data flow#

  1. 1

    Detect the trigger

    A termination confirmation, a deregistration from the switching process or a move-out notice sets the end of supply on the contract – the six-week clock starts here.

  2. 2

    Receive the reading

    The grid operator transmits the cut-off reading via MSCONS. If it has not arrived after a reasonable wait, estimate – the deadline does not wait for the grid operator.

  3. 3

    Apportion and price

    Distribute consumption across price periods, Grundpreis to the day, taxes and levies each with their own validity periods.

  4. 4

    Set off and post

    Net the instalments, post the balance to the contract account, end or recalculate the instalment plan, pay out the credit or make the back-payment due.

  5. 5

    Deliver

    The bill with all mandatory content under § 40 EnWG – for the final bill additionally the statement that the contract has ended and no further instalments will be collected.