Tenant electricity and shared building supply
Electricity from the rooftop PV system straight to the residents – without using the public grid. Two models, two legal frameworks: tenant electricity with an EEG bonus, and shared building supply under § 42b EnWG.
Homeowners consume their own solar power and save grid fees, levies and taxes. Tenants could not do that for a long time – the installation belongs to the landlord, and the electricity would be a supply with all the obligations of an energy supplier. Mieterstrom (tenant electricity) and gemeinschaftliche Gebäudeversorgung (shared building supply) are two answers of the legislator to that problem.
Why it works economically#
Electricity that never touches the public grid incurs no grid fees, no grid-side levies and no Konzessionsabgabe. For installations up to 2 MW in spatial proximity the electricity tax also falls away. Roughly half of the household electricity price consists of exactly these components – that is the margin from which operator and residents draw their advantage. What remains is the residual electricity from the grid when the sun is not shining.
Model 1: Mieterstrom with bonus (§ 21 (3) EEG, § 42a EnWG)#
The classic model since 2017. The installation operator – landlord, energy service provider or cooperative – supplies the solar power to the residents and procures the residual electricity. It is thereby an electricity supplier with all the obligations: supply contract, invoice under § 40 EnWG, electricity labelling, balancing group. In return, the grid operator pays it the Mieterstromzuschlag (tenant electricity bonus) for every solar kilowatt-hour delivered to final consumers.
| Requirement | Rule |
|---|---|
| Installation | PV system up to 100 kW on, at or in a residential building or an ancillary structure; at least 40 % of the building's floor area used for housing |
| Supply | To final consumers in the same building or in residential buildings and ancillary structures in the same neighbourhood (Quartier), without transit through the public grid |
| Contract (§ 42a EnWG) | May not be part of the tenancy agreement; a resident can decline or terminate it without losing the flat |
| Term | At most one year, tacit extension permitted |
| Price | At most 90 % of the basic supply tariff applicable in the grid area – for the total electricity including residual supply |
| Bonus | A few cents per kWh, staggered by installation size and degressive; the current rates are published by the Bundesnetzagentur |
Model 2: shared building supply (§ 42b EnWG)#
Introduced with Solarpaket I in May 2024. The basic idea: the operator distributes the solar power among the participants but is not a supplier – every resident keeps their own electricity supplier for the residual electricity. This removes the supplier obligations that make the classic Mieterstrom model so burdensome for small landlords.
- Gebäudestromnutzungsvertrag (building electricity use contract)
- Governs between operator and participant the offtake of the solar power, the price and the allocation key. The operator owes no full supply.
- Allocation key (Aufteilungsschlüssel)
- Static: fixed percentage shares per participant, independent of consumption. Dynamic: the quantity generated is distributed each quarter hour in proportion to actual consumption. The dynamic key is more accurate and uses more solar power on site, but requires quarter-hour values from all participants.
- Metering
- The precondition is an intelligent metering system at every participating market location and at the generating installation, because the allocation is done per quarter hour.
- Residual electricity
- Supplied by each participant's own supplier – based on the consumption left after deducting the allocated solar power. The allocation is transmitted to grid operator and suppliers via market communication.
- Mieterstromzuschlag
- There is none for shared building supply. The economic advantage lies solely in the grid fees, levies and taxes that fall away.
Comparison#
| Mieterstrom (EEG / § 42a EnWG) | Shared building supply (§ 42b EnWG) | |
|---|---|---|
| Operator is a supplier | Yes, with a full-supply obligation | No |
| Residual electricity | Procured by the operator | Each participant via their own supplier |
| Mieterstromzuschlag | Yes | No |
| Price cap | 90 % of the basic supply tariff | Freely negotiable |
| Metering | Summation meter or sub-meter concept, iMSys not mandatory | iMSys at all participants, quarter-hourly |
| Effort for the operator | High – an energy supplier in miniature | Low – allocation and billing of the solar power |
Kundenanlage – and what the ECJ said about it#
Both models presuppose that the electricity does not use the public grid. Under German law the wiring inside the building counts as a Kundenanlage (customer installation, § 3 no. 24a EnWG): energy installations on a spatially coherent area that are insignificant for competition and open to every supplier without discrimination. A Kundenanlage is not a grid and its operator is not a grid operator – no regulation, no grid fees.
Metering concepts#
- Summation meter model
- A bidirectional meter at the grid connection measures what the building as a whole draws and feeds in. Behind it, sub-meters record each flat's consumption and a generation meter the PV production. The solar share per flat is derived arithmetically. The standard model for classic Mieterstrom.
- Sub-meter per participant
- Here the flat meters are no longer independent market locations but sub-measurements within the Kundenanlage. Residents who do not participate keep their own market location on the grid – their meter is netted out of the total.
- Virtual summation meter
- Instead of a physical summation meter, the grid operator calculates the building balance from the quarter-hour values of all participating intelligent metering systems. That saves rebuilding the meter cabinet and is the model § 42b EnWG presupposes. Whether and how it is offered depends on the metering concept of the respective grid operator.
Billing#
- 1
Record generation and consumption
PV generation, grid offtake at the summation meter, feed-in and consumption per participant – under § 42b quarter-hourly from the iMSys.
- 2
Allocate the solar power
By allocation key per participant; the sum of allocations must not exceed the generation consumed on site. Whatever is not consumed is feed-in.
- 3
Determine the residual electricity
Consumption minus allocated solar power per participant. Under Mieterstrom the operator bills it as well, under § 42b the respective supplier does.
- 4
Issue the invoice
Mieterstrom: one invoice with a solar and a residual share, check the price cap, observe electricity labelling. § 42b: the operator bills only the solar power, the supplier the grid offtake.
- 5
Claim the bonus
Mieterstrom only: the operator proves to the grid operator the solar kilowatt-hours delivered to final consumers and receives the Mieterstromzuschlag – together with the feed-in tariff for the surplus.
Mieterstrom, one month, three flats (simplified)
- PV generation
- 1,200 kWh
- Total consumption of the three flats
- 900 kWh
- Of which covered simultaneously from PV (solar share)
- 540 kWh
- Residual electricity from the grid
- 360 kWh
- Feed-in of the surplus
- 660 kWh