Jump to Content

Invoice correction: reversal, rebilling, credit note

A faulty invoice is never overwritten but reversed and rebilled – with its own invoice number, a reference to the original, and consequences for the contract account and the instalment plan.

Updated: August 2026

Invoices are accounting documents, not files you regenerate “properly this time”. To change an invoice you create a second posting that cancels the first, and a third that gets it right. Anything else throws bookkeeping, VAT and customer communication out of step.

Three ways to fix a mistake#

Storno + rebilling
The Stornorechnung (reversal invoice) cancels the original in full (every line with the sign reversed); the new invoice bills the same period again with corrected data. Three documents, three numbers, a clean account history. The standard route in energy billing systems.
Korrekturrechnung (difference invoice)
A single document showing only the difference between old and new. Shorter, but harder to follow – the customer can no longer see how the new total is made up. Common for small rebillings of individual line items.
Gutschrift (credit note)
A document in the customer's favour – a goodwill credit, say, or the refund of an overcharged amount. Beware: for VAT purposes a “Gutschrift” is strictly an invoice issued by the recipient of the supply (§ 14 (2) UStG). What the utility sends the customer is, correctly, an invoice correction; in everyday use it is still called a Gutschrift.

Typical causes#

CauseHow it surfacesWhat gets corrected
Wrong meter readingcustomer complaint, plausibility check, control readingconsumption and with it every volume-based line
Meter exchange not recordedconsumption jumps or turns negative because old and new meter were mixedtwo consumption segments: old meter up to the removal reading, new meter from the installation reading
Wrong price or wrong price periodprice change entered late, wrong price sheet, wrong tariffthe pricing; the volumes stay
Substitute value replaced by a true valuethe metering point operator delivers the real value later via MSCONSconsumption; often a small difference, but correction is mandatory
Wrong master datatax exemption, Konzessionsabgabe group, customer group or load profile assigned incorrectlyindividual price components, frequently across several years

How far back?#

The three-year limit in the basic-supply ordinances runs in parallel with the standard limitation period under § 195 BGB: also three years, starting at the end of the year in which the claim arose and the creditor knew or ought to have known of it (§ 199 BGB). For a rebilling this means in practice: anything older than three full calendar years the utility can generally no longer enforce – and conversely the customer can demand a refund for the same span. In special contracts § 18 StromGVV does not apply directly, but the terms and conditions almost always contain an identical clause.

Invoice numbers and the document chain#

§ 14 (4) UStG requires every invoice to carry a sequential number with one or more series of digits, assigned once only to identify the invoice. For corrections that means:

  • The reversal and the new invoice each receive their own, new number from the running sequence – the original number is never reused.
  • The reversal references the original (“reversal of invoice no. …”), as does the new invoice (“replaces invoice no. …”). The chain stays traceable in both directions.
  • An invoice correction must refer unambiguously to the original invoice (§ 31 (5) UStDV); only the incorrect details need to be transmitted – in energy billing the full invoice is nevertheless almost always regenerated.
  • Gaps in the number sequence are permitted, duplicates are not. A reversal that physically deletes the original creates exactly such a gap without a document – and thereby breaches the retention obligation.

Effect on the contract account and instalment plan#

  1. 1

    Write off the receivable

    The reversal creates a counter-posting to the original in the contract account. If the original receivable has already been paid, a temporary credit arises.

  2. 2

    Post the new receivable

    The new invoice is posted with its own due date. Payments already made are reassigned, so only the difference remains open or is refunded as a credit.

  3. 3

    Pause dunning

    No dunning run may bite between reversal and rebilling – a customer dunned over a reversed invoice is the most expensive service case there is. The usual solution is a dunning block on the account for the duration of the clarification.

  4. 4

    Review the instalment plan

    If the consumption was wrong, so was the forecast: the new invoice recalculates the Abschlag and replaces the plan's remaining instalments.

  5. 5

    Review subsequent invoices

    If a meter reading was corrected, every later invoice built on the same opening reading is wrong too – the correction then cascades up to the current invoice.

Related topics

Sources & further reading