Grid fees
Fees for transporting and distributing energy including the state charges levied with them – about a quarter of the electricity price.
The grid fee pays for building, running and maintaining the lines – and increasingly for the grid expansion the energy transition requires. It goes to the grid operator, but it is collected by the supplier and sits invisibly inside the end price.
What it is made of#
- Unit rate in ct/kWh – the largest share for households
- Standing charge in €/year – covers connection-related fixed costs
- Capacity charge in €/kW – only for customers with load metering, see Leistungspreis
- A charge for metering point operation and billing, where not shown separately
Order of magnitude for a household: in 2026 the grid fee including metering point operation averages around 11–12 ct/kWh net nationally – with a wide regional spread from under 8 to over 15 ct/kWh depending on the grid area.
Levies collected with the grid fee#
Several statutory levies are collected together with the grid fees. In 2026 those are the KWKG levy, the offshore grid levy and the surcharge for special grid use – 2.946 ct/kWh net in total. Since 2025 the surcharge for special grid use carries not only the § 19 StromNEV discounts but also the nationwide socialisation of renewables-driven extra grid costs under a Bundesnetzagentur ruling – hence the jump from 0.643 ct/kWh (2024) to over 1.5 ct/kWh.
| Levy, 2026 | ct/kWh net |
|---|---|
| KWKG levy | 0.446 |
| Offshore grid levy | 0.941 |
| Surcharge for special grid use | 1.559 |
| Total | 2.946 |
In 2026 the federal government additionally covers part of the transmission grid fees – a subsidy worth around €6.5 billion a year, which lowers grid fees against their unsubsidised level.
Who pays less#
- Customers on higher grid levels – they use less of the network
- Businesses with atypical or energy-intensive grid use under § 19 StromNEV – their discount is financed by the surcharge for special grid use
- Controllable devices under § 14a EnWG – a heat pump, wallbox or battery gets, at the customer's choice, a flat grid-fee reduction (Modul 1), a unit rate reduced by 60 % via a separate meter (Modul 2) or a time-variable grid fee (Modul 3, combined with Modul 1 since April 2025)